Probst Electric completed the installation of conductor for the PX Callaway project starting December 2018 and ending Febuary 2019.
This is a large-scale project with locations throughout the State of Florida. The project consists of replacing (120) core-10 steel structures with galvanized H-Frame Structures per year. Project scope also includes change out of direct embed three-pole deadends and angles ranging from 90-120’ tall.
Starting January 2022, our crew is replacing the existing 230kV transmission line consisting of h-frame structures with a new adjacent 230kV t-line using steel monopole structures while energized.